Proceedings of the Conference on Instrumentation in Oceanography, Tuesday 23rd to Thursday 25th September 1975, University College of North Wales, Bangor

Proceedings of the Conference on Instrumentation in Oceanography, Tuesday 23rd to Thursday 25th September 1975, University College of North Wales, Bangor

4.11 - 1251 ratings - Source



With a 600 foot reel of tape as many as 18, 000 complete 20 channel scans can be recorded. 2.3. ... The sampling time can be adjusted to either lg, 3j, 7j, 15, 30, or 60 minutes. ... There are three main power rails, the COSMOS supply derived from three banks of eight cells, the channel units supply derived from two banks of eleven ... Power switching is accomplished by mating together a power shorting connector, which also generates a reset signal whenever the logger is switched on.


Title:Proceedings of the Conference on Instrumentation in Oceanography, Tuesday 23rd to Thursday 25th September 1975, University College of North Wales, Bangor
Author:
Publisher:I.E.R.E. - 1975
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA